Above is the overall look of the quilt and you can see the gold metallic stitching. Below is a close up...I love doing this but had to stop as my wrist was so sore..could be all the hand work I have been doing and sitting here working on EQ6...It probably will take a few days to finish it...than I can continue on to the table runner from Ripless class. I also have a bed quilt, 6 place mats and a quilt from Fancy That I want to get done before Thanksgiving...I should get them all done...
oh an apron...lol I had to order more thread, gold-YLI metallic today as i did not think I would have enough to finished it with...Have a great day tomorrow..hugs, Lorraine
Subscribe to:
Post Comments (Atom)
Time and Date
Memphis |
Arbee Designs Ruth Blanchet
Arbee Designs on Facebook
No comments:
Post a Comment